FeaturedManhattan Skyscraper CollapseMetro

Midtown NYC High-Rise Evacuated After Support Beams Buckle, Floors Begin Sagging

A Midtown skyscraper under construction was evacuated Tuesday morning after massive steel support beams began buckling inside the building, causing multiple floors to sag and sending bricks tumbling from the structure.

The emergency unfolded around 8:11 a.m. at the 37-story commercial tower at 235 East 42nd Street after construction workers noticed two critical support beams bending on the 21st and 22nd floors, according to the NYPD and FDNY.

As the beams continued to give way, sections of the building between the 21st and 26th floors began sagging under the strain, fire officials said.

Breaking Alerts

Don’t miss the stories that matter.

Get Sean’s breaking news alerts — free, direct to your inbox.

Workers immediately evacuated the site as a precaution.

Despite the alarming structural failure, all construction workers escaped safely and no injuries were reported.

Emergency crews rushed to the scene and quickly cordoned off the area as engineers assessed the stability of the building.

Police shut down both pedestrian and vehicle traffic along East 42nd Street between Second and Third avenues while firefighters and city inspectors investigated the cause of the apparent structural failure.

It was not immediately clear what caused the support beams to buckle or how long the surrounding street closures would remain in effect.

Watch the clips below:

 

 



Source link

Related Posts

1 of 636